preloader
Blog

Pipe line work

1. Confirm the beach mark elevation and coordinates from the approved construction drawing.
2. Locate the bench mark on the site jointly with consultant staff and confirm the location.
3. Shift the bench mark to near by locations of the required sites.
4. Protect the bench mark by concrtete and surround it by warning tape.